LINKS PARK GROUND IMPROVEMENTS
PICTURE DIARY |
|

Preparing the ground for the warm up area |

The New Turnstyles at the east end of the stand |

Mark Peat kicks up a cloud of rubber granules |

The fans try out the new barrier |

The first match kicks off |

The first match underway |

The last of the rubber granules is brushed in |

The finished product |

New standing area opposite the stand |

The goalnets are ready for the first match |

New tarmac by the corner flag |

New tarmac & barrier opposite the stand |

Training begins on the new pitch |

The goal is put to the test |

New pie shop and public changing rooms |

New tarmac is laid around the perimeter |

Brushing Machine |

Rain stops play |

Rubber granules spread on the pitch |

Rubber granules spread on the pitch |

View from the back of the stand |

View from the back of the stand |

Looking towards the Wellington Street end |

Looking towards the Beach end |

View from the penalty spot |

A worm's eye view of the penalty spot |

The first layers of sand go down on the pitch |

The sand laying operation |

The first layers of sand go down on the pitch |

One of the many bags of sand |

View from the corner flag |

The goals go up |

Spreading sand on the new surface |

View from the corner of the new barrier |

New goals are in place |

The sand laying operation |

View from the east terrace |

Loading more sand |

Revealing the underlay |

Bedding in the sand |

View of the main stand |

Revealing the underlay |

Spreading sand on the new surface |

View of the new barrier from the corner spot |

The re-furbished club shop |

View from the corner flag |

Bags of rubber chips waiting to be laid |

Goodbye to the old pie hut |

A worm's eye view of the stand |

The boundary wall gets a fresh lick of paint |

The whole pitch is laid |

A worm's eye view of the stand |

New turnstiles |

Marking out the touchlines |

10 year old Robert Mair helps clear weeds from the Wellington Street terrace
|

Tons of sand waiting to be laid on the artificial surface |

Rolling out another section of turf |

Rolling out another section of turf |

New barrier going up opposite the stand |

View from the Wellington Street enclosure |

View towards the main stand |

Rolls of turf waiting to be laid |

The grassy path is no longer grassy! |

View towards the main stand |

The first strips of turf go down |

Lining up the edges |

Preparing the ground for the warm up area |

Putting down another layer |

The old wooden pie shop |

Tarred area in front of old pie shop |

Various materials |

The shiny new tarmac layer |

Preparation for new turnstiles |

View towards the steeple |

Samples of the new artificial turf |

Samples of the new artificial turf |

Looking towards the Wellington Street enclosure |

Rolling the Links Park surface
|

Rolling the Links Park surface |

Rolling the Links Park surface |

View towards the main stand |

View towards the main stand |

View towards the main stand |

Demolition of the shed begins |

The Links Park turf is dug up |

The Links Park turf is dug up |